|
Title:
|
DELAY ANALYSIS OF IEEE 802.11 MAC ACCESS PROTOCOL BASED ON M/G/1 |
|
Author(s):
|
Gonzalo Arroyo, Walter Grote |
|
ISBN:
|
978-972-8939-19-9 |
|
Editors:
|
Hans Weghorn, Jörg Roth and Pedro Isaías |
|
Year:
|
2010 |
|
Edition:
|
Single |
|
Keywords:
|
MAC IEEE 802.11 delay, M/G/1 queue, service time distribution, no-saturated channel |
|
Type:
|
Full Paper |
|
First Page:
|
98 |
|
Last Page:
|
108 |
|
Language:
|
English |
|
Cover:
|
|
|
Full Contents:
|
click to dowload
|
|
Paper Abstract:
|
This paper presents an analytical model to calculate the total MAC delay experimented for packets, for stable network conditions. This model considers that each station of the network has an M/G/1 transmission queue. What differences this paper from others is that the total delay is derived directly from the exact service time distribution of a packet of the backoff algorithm, instead of using approximations. The no-saturated channel model relies on the idle time of the station, which is also a new approach that avoids approximations from previous models. Evaluations of this model show that it is in close agreement with simulation results. |
|
|
|
|
|
|